Preparing to raise the tower

In this view I am tying a 5600 pound test nylon rope to center of the tower in preparation for the raising.  Through trial and error, I found that the center is not the optimum position (I forgot the lessons of Physics 101).  I later moved the attachment to the top of the tower.

 Continue