At this point, all that remains is to bolt on the remaining hardware, lift the antenna as high on the mast as possible, and tighten the remaining hardware. Be sure to leave a large service loop in the coax between the top of the tower and the antenna so that the cable does not get pulled as the antenna is rotated.